Time Entry UtilityGIP Phase II IntegrationBatch 07d6bb74
Past RunsHome
Run Summary
locator.waitFor: Timeout 60000ms exceeded. Call log: - waiting for locator('#dailyPlanGridData') to be visible
Failed
Mar 26, 2026, 2:17 AM
File
TLLR - Coco_Timesheet_Period_2026_3_8 to 2026_3_21_09_15_56.xlsx
Project
2 project buckets across 2 days
Target
InEight Visual Browser
Last Update
Mar 26, 2026, 2:20 AM
Last Known URL
https://gipi-tst.hds.ineight.com/AppPlan/DailyPlan/DPWorkSpace?projectId=180&dailyPlanId=1102&selectedTabIndex=1
Failure Context
This batch stopped before submission and kept the failing step details for QA review.
Rows In File
341
Rows Ready
3
Mode
Visual Browser
locator.waitFor: Timeout 60000ms exceeded. Call log: - waiting for locator('#dailyPlanGridData') to be visible
Project Validation
Project validation completed before the run stopped later in the pipeline.
Projects Checked
18
Projects Found
2
Rows To Skip
149
Validated At
Mar 26, 2026, 2:17 AM
Missing project ids: 1044132, 1044214, 1044232, 1047840, 1073240, 1074234, 1074314, 1074332, 1074710, 1077824, 1077840, 1047899900, 1077822202, 1077823101, 1077825402, 1077899900
Missing project rows were removed from this run. The parsed workbook preview below now reflects only the rows that still remain eligible for phase validation and the next automation stage.
Phase Validation
Phase validation stopped the run because the remaining project/phase pairs could not be resolved in InEight.
Projects Checked
2
Pairs Checked
2
Pairs Found
2
Rows To Skip
0
Validation Source
control-cost-item
Validated At
Mar 26, 2026, 2:17 AM
Execution Log
Every stage of the run is tracked independently, and error detail can be reopened from the failed step.
Parse workbook upload
Validated 341 row(s) across 8 day sheet(s) and ignored 189 row(s) without a job/cost number.
00:03
Completed
Build entry plan
Prepared 152 row(s) for browser replay and saved the grouped workbook snapshot for QA review.
00:00
Completed
Prepare automation session
Credentials were supplied with the run request. Target URL: https://gipi-tst.hds.ineight.com/. Visual browser mode is enabled.
00:00
Completed
Validate projects in InEight
You chose to continue after skipping 149 row(s) tied to missing project id(s): 1044132, 1044214, 1044232, 1047840, 1073240, 1074234, 1074314, 1074332, 1074710, 1077824, 1077840, 1047899900, 1077822202, 1077823101, 1077825402, 1077899900.
00:11
Warning
Validate phase codes in project
Validated 2 distinct project/phase pair(s) across 2 project(s) using the InEight control-cost-item export. No missing phase codes were found.
00:08
Completed
Sign into InEight
Signed into InEight successfully and landed on https://gipi-tst.hds.ineight.com/AppCore/UserLandingView.
00:06
Completed
Open project daily planning
Opened project 1047824105 and navigated into Daily planning (1/2).
00:15
Completed
Create daily plan
Created daily plan TU 1047824105 2026-03-12 07d6b for 1047824105 on Mar 12, 2026.
00:34
Completed
Fill time sheet
The resumed run stopped before the remaining steps could finish.
01:12
Error
Sign out, submit, and approve
Waiting to complete the remaining sign-out and approval actions for the plan.
Queued
Waiting
Finalize run output
Waiting to save the run summary and preserve the detail trace.
Queued
Waiting
Payload Snapshot
Current replay payload and metadata captured for this batch.
Parsed Workbook
Day sheets, project buckets, and employee/task hours as parsed from the uploaded workbook.
189 rows were ignored because the workbook did not include a `job.cost` number for them.
Mar 12, 2026
Timesheet_3_12_2026
1 project
2 entries
9.5 hrs
Mar 17, 2026
Timesheet_3_17_2026
1 project
1 entry
1 hr